Home
EVENTS
History and Background
Rules
Roster
MOW
LIFE AND TIMES
PB&S RR Guest Photo's
Railroad Links
Telegraph us! (Via email)

The Pacific Beach & Summit RR

New Photo Montage of Our Development

Click the "Player" below, twice to play.  (There is sound).

1stweek.jpg
(Before the "raising" of Troll Bridge).

offwego.jpg

Our Track

Gage is 7 1/2" and the scale is 1 1/2" and 2 1/2".  It is interesting to note that everything for the layout is done on site;  bending tracks for 50 foot minium radius turns, and all the ties (recycled plastic...1 1/2" x 1 1/2") are cut and routed individually.  (The track has a tie about every 4-6 inches).

trackfabrication.jpg
Track Fabrication

pb14.jpg
Supt. Tearney building his railroad.

pb3.jpg
Track instalation to loop around Bay Rum Island.

pb2.jpg
Supt. Tearney welding track.

History and Background
 
Construction of the PB&S RR commenced on May 5 '04.  Work has been started with help and determination of members and friends of the Pacific Beach & Summit RR.
 
"Kelly's Loop" has been completed around the Pacific Beach Station.  Connections to Troll Bridge, Billy Goat Gulch, North Shore Hot Springs, Conductor's Cove, and Bay Rum Island are now in service.  Coming soon... Shack's Shack and The Summit Round House.

pb21.jpg
An early run under Troll Bridge.

pb9.jpg
Under Troll Bridge and through Billy Goat Gulch.

Shack , Trainmaster of PB&S RR
pb25.jpg
"No Bo's ride my train!"

acharlie.gif

Switch is in!
pb72.jpg
And it gets a little more interesting!

NEXT PAGE (Rules)