Home
EVENTS
History and Background
Rules
Roster
MOW
LIFE AND TIMES
PB&S RR Guest Photo's
Railroad Links
Telegraph us! (Via email)

The Pacific Beach & Summit RR

MOW

Maintenance of Way

pb43.jpg
PB&S RR gains access to the world!

pb28.jpg
Shack, PB&S RR Trainmaster raising the track.

pb40.jpg
Senior Member of MOW Crew, Alma

George doing a little track maintenance.
picture018.jpg
Apprentice Welder, Laura looks on.

Materials:
 
Rail is 3/8" X 1" hot rolled steel in 20' lengths. Ties are recycled colored plastic 1 1/2" X 1 1/2" X 8' stock. Ties were routed for rail, which was then pressed with a port-a-power into the grooves of the 14" length ties. Roadbed is 5/8" minus clean rock.

NEXT PAGE (Life & Times of the PB&S RR)